Insured roofers · Photo-documented findings · Free roof assessments
(214) 272-2170Roof Replacement in Plano, Texas
Complete tear-off and a new system for homes from Legacy Drive to Parker Road, with every component priced on its own line before anything is ordered.
(214) 272-2170 — price your replacementWhen a Plano Roof Has Genuinely Reached the End
Roof replacement in Plano usually arrives for one of three reasons: a composition roof that has simply run out its service life, a hail season that finished off a roof already close to the end, or a real estate transaction where an inspector put a number on it. The assessment that precedes the work answers which of those you are actually in, because the first two often look identical from the driveway and are very different conversations.
Our roofers walk every slope, lift where lifting is safe, check the decking for softness underfoot, photograph the flashing at every wall, chimney and penetration, and look at the ventilation balance that governs how long the new roof will last. What you receive is a set of images organized by slope and an itemized scope listing tear-off, deck replacement by the sheet, underlayment, valley and eave protection, starter, field shingle, ridge and hip, ventilation, flashing, boots, disposal and permit as their own lines.
If any part of that says the roof has years left, we will say so, and the replacement conversation waits.
What a Full Replacement Actually Covers
Every item below appears on the scope with its own price, so nothing is folded into a single figure you cannot interrogate.
Complete tear-off to the deck
Every existing layer comes off, including any prior overlay, so the new system sits on wood rather than on the failures of the last roof. Nothing is installed over shingles.
Decking inspection and replacement by the sheet
Once the deck is exposed, our roofers walk it and mark every soft, delaminated or rotted panel. Replacement is billed per sheet at a rate agreed before the tear-off starts, so a bad deck cannot become a mid-job negotiation.
Synthetic underlayment across the field
A full-coverage synthetic layer replaces the felt most older Plano roofs were built with, holding up to the wind exposure the deck sees between tear-off and dry-in.
Self-adhering membrane in the valleys and at the eaves
Valleys and other water-concentration points get a self-adhered membrane rather than relying on the shingle alone, which is where a large share of older leaks in this city actually originate.
Starter course and manufacturer-specified fastening
Starter is a purpose-made product rather than a cut field shingle, and fastening follows the manufacturer's nailing pattern, which is the condition most commonly missed and the one that voids material warranties.
Field shingle installed to specification
Architectural composition is the default in Collin County, with impact-rated Class 4 options available and quoted separately so you can see what the upgrade actually costs.
Flashing renewed at every interruption
Wall flashing, step flashing, counter flashing, chimney detail, skylight curb and every pipe penetration is renewed rather than reused. Old flashing under a new roof is a leak on a delay timer.
Ventilation checked and balanced
Intake at the soffit and exhaust at the ridge are measured against the attic volume, because a new roof over a starved attic cooks itself from underneath and ages years early in a North Texas summer.
Ridge and hip capping
Purpose-made cap rather than cut three-tab, installed over ridge vent where the design calls for it.
Permit, disposal and cleanup
The City of Plano permit is pulled by us and shown as its own line, debris is loaded as the tear-off progresses, the dumpster leaves with the crew, and the driveway, walkways, beds and lawn get a magnetic sweep.
Three Stages, Described Before Any of Them Start
The assessment
A roofer walks every slope, photographs the condition, measures the roof, checks the attic side where access allows, and notes the ventilation configuration. This normally takes forty-five minutes to an hour on a typical Plano home. Nothing is quoted from a satellite image alone.
The scope and the decisions
You receive the photographs and the itemized scope, and we walk it with you line by line: material choice, impact rating, ventilation changes, and the agreed per-sheet decking rate. Once you sign it, material is ordered and a start date goes on the calendar, weather permitting, usually within a week or two outside the peak of storm season.
The install
Material lands the day before or the morning of. The crew protects landscaping, AC units and windows, tears off, decks, dries in, installs and details, then cleans up and sweeps. Most Plano homes complete in a single day; larger or steeper roofs run into a second. You get photographs of the finished work and the written workmanship warranty at close-out.
Three Reasons This Replacement Goes Differently
The decking rate is agreed in advance.
The single most common way a roof replacement price moves after the contract is signed is rotten decking discovered at tear-off. Fixing the per-sheet rate before the job starts turns that from a surprise into arithmetic.
Nothing is reused that should not be.
Flashing, boots and starter are renewed as a matter of course rather than as an upsell. A roof is a system, and reusing the twenty-year-old parts of it is how a new roof leaks in year three.
The warranty on our labor is a separate document.
The manufacturer's material warranty is theirs. Ours covers our own installation, in writing, with its own term, so a workmanship question never turns into two companies pointing at each other.
Get the Replacement Priced Properly
A replacement is the largest single exterior expense most Plano homeowners ever authorize, and it should not be authorized off a one-page number. Book the assessment, get the photographs and the itemized scope, and make the decision with the same information we have.
(214) 272-2170 — price my replacement